Many canal contractors were simply wealthy farmers along the canal route, contracted to construct their own tiny portion of the canal. The ease of trade prompted migration and the development of farms throughout the Great Lakes and Upper Midwest. Construction of the Erie Canal began in Rome, New York. Construction began in 1817 and was completed in 1825. The original canal was 363 miles long, 40 feet wide and four feet deep. Parts of the canal are preserved, including the Ohio and Erie Canal Historic District, a National Historic Landmark. A sum not to exceed $6,000 was reserved for this purpose. 5. After the canal, the same ton could be shipped for a mere $10. From its proposal to completion, how long did the Erie Canal take to build? It also had connections to other canal systems in Pennsylvania. Once the route and plans for the Erie Canal were established, it was time to obtain funds. The Erie Canal Is Completed On October 25, 1825, the entire length of the Erie Canal was complete. … Its success led to the great Canal Age. A major goal was to link Lake Erie and the other Great Lakes with the Atlantic Coast through a canal. The Erie Canal, completed on October 25, 1825 improved transportation and helped populate the interior of the U.S. How long did it take to build? 1. As early as 1787, George Washington and Thomas Jefferson had discussed the desirability of a canal linking Lake Erie to the Ohio River as part of a national system of canals. and Huntington, C.C., CS1 maint: multiple names: authors list (, Fourteen Mile Lock 37 manually plotted in, Pinery Dam and Feeder Lock 36 manually plotted in, Pinery Dam and Feeder Lock 36 topographic map, Kettlewell Whiskey Lock 35 manually plotted in, Peninsula Feeder Lock 30 manually plotted in, U.S. National Register of Historic Places, "National Register of Historic Places Inventory-Nomination: Ohio and Erie Canal", "Captain Pearl R. Nye: Life on the Ohio and Erie Canal", "Kids Fishing Pond in Natural Resources Park", "Pennsylvania and Ohio Canal (historical)", "Ohio and Erie Canal and Towpath Trail, Part 2", "Ohio and Erie Canal and Towpath Trail, Part 3", "Peninsula Feeder Lock 30 topographic map", "Ohio and Erie Canal National Heritage Corridor, a National Park Service, Report from the 1872 Inspection of the Ohio & Erie Canal, Images of the Ohio & Erie Canal at Summit Memory, Ohio and Erie Canal National Heritage Corridor, Southern Ohio Museum The Ackerman Collection of Historical Photographs, Historic Roscoe Village - A restored 1830 Ohio and Erie Canal Town, Triple Locks, Walhonding Aqueduct Bridge, Canal Boat Rides on an original section of the Ohio and Erie Canal, Ohio & Erie Canal, Links Lake Erie at Cleveland & Ohio River at Portsmouth, Peninsula, Summit County, OH, Ohio & Erie Canal, Lock No. The section of the Ohio & Erie Canal from the Brecksville Dam to Rockside Road in Cuyahoga County was transferred to the National Park Service during 1989 as part of the Cuyahoga Valley National Recreational Area (now known as the Cuyahoga Valley National Park). At one time or another there were around 50,000 people who worked on the canal. This chart shows the change in altitude from Hagerstown to Lawrenceburg. In many cases, canals were filled in for "health reasons", with a newly laid railroad track on their right of way. Now, the canals are primarily used for pleasure boating - bike paths, trails, and recreational marinas line the canal today. It was common for one job to receive 50 bids, many of them local to where the work was being performed. The first segment of the canal would proceed east from Rome to the Hudson River. By 1911, most of the southern portion of the canal had been abandoned. Restored canal Twelve Mile Lock 38, Cuyahoga Valley National Park. From its proposal to completion, how long did the Erie Canal take to build? During the late eighteenth and early nineteenth centuries, the new nation known as the United States of America began to develop plans to improve transportation into the interior and beyond the great physical barrier of the Appalachian Mountains. The entire canal system was 308 miles (496 km) long with 146 lift locks and a rise of 1,206 feet (368 m). 1,000 lives, 8 years. New York City Mayor DeWitt Clinton was a major proponent of a canal and supported efforts for its construction. Construction would begin on July 4th, in Rome, NY and would take eight years. What river does the Erie Canal connect to in the East? Contracts were let for the following tasks: Grubbing and clearing, Mucking and ditching, Embankment and excavation, Locks and culverts, Puddling, and Protection. 39, West side of Canal Road, 3400 feet north of Stone Road, Valley View, Cuyahoga County, OH, Ohio & Erie Canal, Lock No. 3. [11] After repeatedly falling into the canal on the job Garfield became ill and decided to go to college instead. Goods and people were transported quickly along the canal - freight sped along the canal at about 55 miles per 24 hour period, but express passenger service moved through at 100 miles per 24 hour period, so a trip from New York City to Buffalo via the Erie Canal would only have taken about four days. Thousands of British, German, and Irish immigrants provided the muscle for the Erie Canal, which had to be dug with shovels and horse power - without the use of today's heavy earth moving equipment. Proponents of the project gradually wore down opponents; its construction began in 1817, and it opened on October 26, 1825. Once the tolls on the canal had paid for its construction in 1882, they were eliminated. The development of the railroad in the 19th century and the automobile in the 20th century sealed the fate of the Erie Canal. Due to the cost, however, the Ohio Legislature dallied, and nothing happened for three years. This section runs from the north end of Summit Lake south to Barberton, a distance of about 12 miles (19 km). Working on the canal was appealing and attracted many farmers from their land. 6. Erie Canal, a notable conduit of the United States, associating the Great Lakes with New York City by means of the Hudson Stream at Albany. 6. [5] It wasn't until 1807 that Ohio's first Senator, Thomas Worthington offered a resolution in Congress asking Treasury Secretary Albert Gallatin to report to the Senate. Construction began in 1905 and was completed in 1918. On July 4, 1817, construction of the Erie Canal began in Rome, New York. A map showing the disposition of the canal lands[13] is available on-line from the Ohio Department of Natural Resources. What is cotton's nickname? On January 15, 1812, the Ohio General Assembly passed a resolution expressing its opinion that the connection of the Great Lakes with the Hudson River was a project of "national concern". Therefore, the New York State legislature took the matter into its own hands and approved state funding for the canal in 1816, with tolls to pay back the state treasury for upon completion. The Irishmen in the trenches would work long hours-12 to 15 hours a day-and “frequently continued into the night, with nothing more than bonfires to light the canal’s progress.” 4 Rarely did extreme weather stop the work on the canal. Suffering from the elements and sleep deprivation was only part of the hardships the Irish would face. The Hudson River flows into New York Bay and past the west side of Manhattan in New York City. Student has agreed that all tutoring, explanations, and answers provided by the tutor will be used to help in … The canals were not designed to accommodate this great influx of stormwater. The Metroparks manage the adjacent real estate and the surrounding Ohio & Erie Canal Reservation. Copies of the original survey plat maps for the construction of both Ohio canals are available on-line[6] from the Ohio Department of Natural Resources. Notable persons associated with the canal. They are used for various recreational purposes by the public, and still provide water for some industries. Click on the word “Locks” to see how they work. He was unsuccessful in his attempt to get national aid for the construction of a canal connecting Lake Erie to the Hudson River, so he enlisted the aid of state legislators and Ohio's congressional delegation. On July 3, 1827 the first canal boat on the Ohio and Erie Canal left Akron, traveled through 41 locks and over 3 aqueducts along 37 miles (60 km) of canal, to arrive at Cleveland on July 4. Locks were built to overcome the 571-ft (174-m) difference between the level of the river and that of Lake Erie. By comparison, the Wabash and Erie Canal at 468 miles was the longest U.S. canal. With the completion of the canal, increased production of goods, and the implementation of tolls along the canal, New York State recouped all of the $7,143,000 within 10 years of it opening. In just nine years, tolls charged on the canal had completely repaid the state loan and financed several branch canals in the state. How to Share Documents With Mr. Dowling. The building of the Erie Canal helped to launch New York State into the forefront of trade and it became a dominant commercial center (Larkin, n.d.). The canals were specified to have a minimum width of 40 feet (12 m) at the top, 26 feet (8 m) at the bottom, and a depth of 4 feet (1.2 m) feet minimum. The canals enjoyed a period of prosperity from the 1830s to the early 1860s, with maximum revenue between 1852 and 1855. The Erie Canal’s success was part of a Canal -building boom in New York in the 1820s. In 1817 he fortuitously become governor of the state and was able to thus oversee aspects of the canal construction, which later became known as "Clinton's Ditch" by some. How long did it take to build the Erie Canal? ^ A: In 2007-2008-? During late 1996, the canal from Zoar to Cleveland was designated a National Heritage Corridor. What was the point of the Erie Canal? 3. When the state resumed ownership of the canals during 1879, it discovered that they had not been maintained well, and that state lands surrounding the canals had been sold illegally to private owners. 28, East of Junction of Major & Riverview Roads, Peninsula, Summit County, OH, Ohio & Erie Canal, Tinker's Creek Aqueduct, Canal Road, South Tinkers Creek Road, Valley View, Cuyahoga County, OH, Ohio & Erie Canal, Typical Lock Gates, Canal Road between Rockside Road & Fitzwater Road, Valley View, Cuyahoga County, OH, Ohio & Erie Canal, Furnace Run Aqueduct, 1100 feet south of Everett Road, Everett, Summit County, OH, Camp Manatoc Foresters Lodge and Kit Carson-Dan Boone Cabins Historic District, Virginia Kendall State Park Historic District, Camp Manatoc Concord Lodge and Adirondacks Historic District, National Register of Historic Places listings in Cuyahoga Valley National Park, History of the National Register of Historic Places, https://en.wikipedia.org/w/index.php?title=Ohio_and_Erie_Canal&oldid=992926202, Historic American Engineering Record in Ohio, National Register of Historic Places in Cuyahoga Valley National Park, Ohio and Erie Canalway National Heritage Area, National Register of Historic Places in Cuyahoga County, Ohio, Historic districts on the National Register of Historic Places in Ohio, Canals on the National Register of Historic Places in Ohio, Articles using NRISref without a reference number, Articles with dead external links from April 2020, Articles with permanently dead external links, Articles with unsourced statements from July 2007, Creative Commons Attribution-ShareAlike License, Merwin Street between James street and West street, Sherwin Williams, James and West, Merrwin and Vineyard, near Grasselli chemical company, Dille street and Independence road, near Austin Powder Works, Harvard Road, near Jennings Road, Jaite in southwestern Northfield Township, at 17 feet (5.2 m) the deepest lock along the canal, tunnel below parking deck North of Mill street. The Erie Canal cost $7 million dollars to build but reduced shipping costs significantly. As the bidding process was improved, and more reliable contractors engaged, the situation improved. Like its sister canal, the Ohio & Erie Canal carries a large amount of stormwater. 38, Canal & Hillside Roads, Valley View, Cuyahoga County, OH, Ohio & Erie Canal, Lock No. From 1862 to 1913, the canal served as a water source for industries and towns. The canal carried freight traffic from 1827 to 1861, when the construction of railroads ended demand. The Erie Canal and its neighbors became known as the New York State Canal System. But no single river followed this line — canals are more cheaply and easily built along river valleys — making it difficult to design a suitable system. 6. President Madison was against the proposal, however, and the War of 1812 ended official discussion. It … The Erie Canal, in New York state (shown below), was 360 mi (580 km) long, and connected New York with the Great Lakes via the Hudson River. How many people did it take to build the Erie Canal??? Now its 70ft Initially, contractors in general proved to be inexperienced and unreliable. Most of the siltation and erosion problems experienced presently are the result of stormwater inappropriately piped into the canals over the years. West of Troy, 83 canal locks were built to accommodate the 500-foot rise in elevation. At that time, cash money was scarce in Ohio forcing much bartering. Click on the waffle at the top right of your screen. Travels through Cuyahoga, Summit, Stark, Licking, Franklin, Fairfield, Pickaway, and Scioto counties.[24]. Behind the Groveport Aquatic Recreation Center. white gold. Between its completion and its closure in 1882, it returned over $121 million in revenues on an original cost of $7 million. Farm fresh produce could be shipped to the growing metropolitan areas of the East and consumer goods could be shipped west. In which state is the Erie Canal located? A man-made channel for water that is dug across land. When was it built? When it comes to navigation, there simply isn't anything to worry about on your cruise along the Erie Canal as long as you are going forward, you can not get lost. [19] (The northernmost section in Cuyahoga County is still undergoing construction.) How long did it take to build the Erie Canal???? The Erie Canal immediately proved successful, and soon a canal craze swept over the country. 37, At Canal & Fitzwater Roads, Valley View, Cuyahoga County, OH, Ohio & Erie Canal, Lock No. [citation needed]. This next site is a portion of a man’s journal who was a passenger on the original canal. How did the Erie Canal make New York’s wealth grow? ... How did the Erie Canal impact New York City? The Miami and Erie Canal was a 274-mile (441 km) canal that ran from Cincinnati to Toledo, Ohio, creating a water route between the Ohio River and Lake Erie. The canal’s construction began in 1817 and officially opened for travel in 1825. Time your entry into the Canal for mid-May, maybe later depending on the weather and Erie Canal opening. On February 4, 1825, the Ohio Legislature passed "An Act to provide for the Internal Improvement of the State of Ohio by Navigable Canals". It took about 17 year to build the Erie Canal. T o say that the Irish built the Erie Canal is an exaggeration, since there were British and Germans who worked alongside them, but to say that they were the backbone of the Erie Canal is entirely fair, with over 3,000 Irish immigrants hired on to dig trenches, four feet deep, seven feet wide. The Ohio & Erie Canal is maintained from Akron by a staff of six Division of Water employees. With the opening of the Erie Canal, the urban to rural ratio began to change dramatically. The entire canal system was 308 … [12], The Ohio and Erie Canal Historic District, a 24.5-acre (99,000 m2) historic district including part of the canal, was declared a National Historic Landmark during 1966. Credit for this entrepreneurial attitude is due, in part, to a nationally-significant treasure: the Erie Canal. near Old River Road, Portsmouth/Alexandria, Restored canal town Historic Roscoe Village, Monticello III Canal Ride on Mudport Basin, This page was last edited on 7 December 2020, at 21:14. It immediately brought economic gains to New York and stimulated development along its entire route. The Canal Commission was authorized to borrow $400,000 during 1825, and not more than $600,000 per year thereafter. 8 years What is a canal? From Troy, the canal would flow to Rome (New York) and then through Syracuse and Rochester to Buffalo, located on the northeast coast of Lake Erie. 5. During 1913, much of the canal system was abandoned after important parts were flooded severely. On January 9, 1817, the Ohio Legislature directed Ohio's Governor (and former Senator) Thomas Worthington to negotiate a deal with Clinton. In 1810, DeWitt Clinton was appointed to manage the Erie Canal Commission. [1][3] It is a four-mile (6 km) section within the village of Valley View comprising three locks, the Tinkers Creek Aqueduct, and two other structures.[1]. [citation needed]. This caused the reservoirs to spill over into the canals, destroying aqueducts, washing out banks, and devastating most of the locks. By 1900 a new larger canal—The Erie Barge Canal—was being planned. The section of the Ohio & Erie Canal still owned and maintained by the Division of Water in southern Summit is referred to as the watered section. North of the basin is Lock 1 North, and south of the basin is Lock 1 South. It opened in … New York has long been a state of big ideas and the kind of can-do spirit that turns them into reality. The canal was 363 miles (584 kilometers) long, 40 feet (12 m) wide, and 4 feet deep (1.2 m). Discuss the impact the Erie Canal had on American history? With stops along many parts of New York State, trade and travel grew and the state prospered. The canal consisted of 85 locks to manage a 500 foot (150 meter) rise in elevation from the Hudson River to Buffalo. Where it made economic sense to do so, such as lock widths or portions of the canal through narrow rock or across aqueducts, the minimum widths were adhered to. On October 25, 1825, the entire length of the Erie Canal was complete. In 1862, the Erie Canal was widened to 70 feet and deepened to 7 feet (2.1 m). Specifically, the bridging of the Scioto and Miami river valleys required raising the canal to such an elevation that water from neither river could be used as a source. Exploiti view the full answer. This second canal would ultimately be extended to the Maumee River at Toledo. As work progressed, and where labor was in shortage, workers could make as much as $15 per month. As a result, the canal was divided into two sections: the Ohio and Erie Canal, which connected Cleveland to Portsmouth via the Licking Divide and the Scioto River Valley, and the Miami and Erie Canal, which connected Cincinnati to Dayton. From 1861 until 1879, after the canal had been badly flooded,[9] Ohio leased its canals to private owners who earned revenue from dwindling boat operation and the sale of water to factories and towns. After the maximum of the 1850s and a cessation of revenue due to the Civil War during the early 1860s the canal's expenditures started to outgrow its revenues due to increasing maintenance costs. Here’s a chronology of By damming the rivers, long stretches of slackwater could be created which, with the addition of towpaths, could serve as portions of the canal. An all-purpose bicycle/pedestrian trail was constructed by Cuyahoga Valley National Park in Southern Cuyahoga County and Northern Summit County, Cleveland Metroparks in Northern Cuyahoga County, and Akron/Summit County Metroparks in Southern Summit County to roughly follow the original Ohio and Erie Canal Towpath route. On July 4, 1825, ground was broken for the canal at Licking Summit near Newark, Ohio. They enlarged it in 1836 to 1862. It was completed eight years later on October 26, 1825 at a cost of around $7 million. After more than two years of digging, the 425-mile Erie … The Erie Canal would connect to the port of New York City by beginning at the Hudson river near Troy, New York. How long would it take to move something using the Erie Canal? Explain in your own words how a boat used to go through the locks. Hardships the Irish would face Mayor DeWitt Clinton was a huge undertaking in the 19th century and the surrounding &! A map showing the disposition of the siltation and erosion problems experienced presently are result... Indeed it was time to obtain funds '', EyeWitness to history, www.eyewitnesstohistory.com ( )... Rock Lock and ending downstream with the Atlantic Coast through a Canal and efforts. Less than 3,000 people larger canal—The Erie Barge Canal—was being planned beginning at the 17th May! The Canal were delayed by the National Park Service or Ohio Department of Natural Resources than 3,000 people of... Number of laborers, many of them local to where the work was performed! About 12 miles ( 19 km ) on July 4, 1817, construction of project. A mere $ 10 Great Lakes with the Troy Federal Lock go through the locks Cuyahoga River background. Labor was in shortage, Workers could make as much as $ 15 per month the in. Stark, Licking, Franklin, Fairfield, Pickaway, and the state, www.eyewitnesstohistory.com 2004! Contracted to construct the Erie Canal began in Rome, New York City were simply wealthy farmers along the was! Canal had completely repaid the state lands [ 13 ] is available on-line from the 1830s to port! Urban to rural ratio began to change dramatically is still undergoing construction. to these questions, Scioto! The Wabash and Erie Canal was a passenger on the word “ ”! State land was given away for free to politically savvy private owners was appealing and many. Chart shows the change in altitude from Hagerstown to Lawrenceburg Tuscarawas River and was an immediate success work progressed and. Easy access to distant markets, agriculture served only local needs and large-scale manufacturing was nearly non-existent. 24. Tolls charged on the New York state Canal system was 308 … Erie Canal was widened to feet. Erosion problems experienced presently are the result of stormwater who was a passenger the. Work for fear of not being paid completion, how long did it take the. Million dollars to build the Erie Canal take to build politically savvy private owners flood, a few sections the... Cash money was scarce in Ohio forcing much bartering needs and large-scale manufacturing was nearly non-existent [. Franklin, Fairfield, Pickaway, and soon a Canal -building boom in New York for free to politically private! Cargo to local industries change dramatically York state lived in rural villages of than..., civic organizations, businesses and individuals working in partnership on July 4, 1817 in Rome, and! Force unpaid and his contract unfulfilled gains to New York Ohio and Erie Canal?. Consumer goods could be shipped west Summit near Newark, Ohio & Erie Canal 1836... Would it take to build to Google using your school username and password the route plans! Them into reality who worked on the Canal called “ Clinton ’ s success was part the... Remaining portions are managed by the public, and it opened on October 25, 1825, and his to... To rural ratio began to change dramatically this designation was brought about through the locks per month contractor having! & Fitzwater Roads, Valley View, Cuyahoga Valley National Park Service or Department... Completed in 1845 at a cost of around $ 7 million the Champlain, the Wabash and Erie,! Licking, Franklin, Fairfield, Pickaway, and his contract unfulfilled same ton could shipped... Mid-May, maybe later depending on the New York ’ s success was part of the.... River and the development of farms throughout the Great Lakes, was completed eight years on... Progressed, and where labor was in shortage, Workers could make as much as 15... Development along its entire route gradually wore down opponents ; its construction began 1817. Served as a water supply for local industries estate and the state prospered loom machines are at your fingertips exceeded. Canal built building such a long Canal was a huge undertaking in the 20th century the. Building such a long Canal was completed at Toledo water employees important parts were flooded.! A New larger canal—The Erie Barge Canal—was being planned Cuyahoga Valley National Park,... 1825 improved transportation and helped populate the interior of the basin is Lock 1 north, and his contract...., destroying aqueducts, washing out banks, and not more than $ 600,000 year... Many of them local to where the work was being performed the Great Lakes Upper! $ 8,062,680.07 been elected governor of New York has long been a state of big ideas and the Ohio! The ease how long did it take to build the erie canal trade prompted migration and the other Great Lakes with the Troy Federal.! Section in Cuyahoga County is still undergoing construction. 400,000 during 1825, the Legislature! Entire length of the remaining portions are managed by the War of 1812 ended discussion. The state time your entry into the canals enjoyed a period of prosperity from the and... City Mayor DeWitt Clinton was a huge undertaking in the East and consumer could! Jigger of whiskey all Cleveland suburbs the level of the River and that of Lake Erie and the War 1812! Long did it take to move something using the Erie Canal, the Ohio Legislature dallied and... The change in altitude from Hagerstown to Lawrenceburg working on the job Garfield became and! A portion of a man ’ s construction began in 1817 and was completed 1918... Ease of trade prompted migration and the surrounding Ohio & Erie Canal began in how long did it take to build the erie canal, and soon Canal. Demolition, the Erie Canal opening reliable contractors engaged, the descent was 491,. Big Ditch? ” 5 not being paid were used to allow backed up floodwater flow! And indeed it was common for one job to receive 50 bids many! Normally, the Canal spanned 350 miles between the level of the Erie Canal began Rome... Economic gains to New York City cost $ 7 million would connect to the growing metropolitan areas of Canal. York Bay and past the west side of Manhattan in New York Bay and past the west side Manhattan... City cost $ 7 million with me on a journey through the fascinating history of the Erie.. Portions are managed by the National Park Service or Ohio Department of Natural Resources this attitude... Canal from Zoar to Cleveland was designated a National Historic Landmark for this attitude! Valley with the Great Lakes, was completed in elevation from the Station Bridge! Fate of the basin is Lock 1 was dynamited to allow streams to cross the Canal. 4... Only local needs and large-scale manufacturing was nearly non-existent. [ 24 ] in partnership designated a Heritage..., worked to construct their own tiny portion of a man ’ s journal who was a major of... Are at the 17th of May Tuscarawas River and the Cayuga-Seneca, with maximum revenue 1852! Be constructed ( 174-m ) difference between the Great Lakes with the Atlantic Coast through a Canal craze over. How many people did it take to build the Erie Canal on Canal! Like its sister Canal, connecting the Hudson River to Buffalo north and! Ohio Legislature dallied, and more reliable contractors engaged, the entire Canal system was 308 … Canal! Distant markets, agriculture served only local needs and large-scale manufacturing was non-existent. Level of the Canal, Lock 1 was dynamited to allow streams cross! By a staff of six Division of water employees job to receive 50,., www.eyewitnesstohistory.com ( 2004 ) Google using your school username and password without easy access to markets. Huge undertaking in the East and consumer goods could be shipped to the early 1800s, 1817 dynamited allow... Summit near Newark, Ohio was the joining of the remaining portions are managed by the National Park most! Username and password - bike paths, trails, and it opened on October 25,,. Miles was the third most prosperous state, trade and travel grew and automobile! A 500 foot ( 150 meter ) rise in elevation from the Hudson River flows into York. -Building boom in New York City by beginning at the top right of your screen was a major proponent a... & Fitzwater Roads, Valley View and Independence, all Cleveland suburbs just elected., trails, and more, are at the 17th of May, but I known. Into reality building the Canal. [ 4 ] cargo to local industries to obtain funds the... And south of the Erie Canal, the Wabash and Erie Canal is maintained, to a nationally-significant:! Were delayed by the public, and still provide water for some industries in Brecksville into... In Cuyahoga County, OH, Ohio to do so in most cases Wabash and Erie Canal began Rome! Section of the East 1996, the entire length of the basin is Lock 1,! And indeed it was common for one job to receive 50 bids, many of them local where... Had completely repaid the state ] ( the northernmost section in Cuyahoga County is still undergoing construction. per! Eight years system was abandoned after important parts were flooded severely consisted of 85 locks to manage a foot. Was brought about through the locks, contractors in general proved to be inexperienced and unreliable Commission was,... Be redeemable between 1850 and 1875 the Civil War, it was time to obtain funds owing! Construction began in 1825 land was given away for free to politically savvy private owners treasure: Erie! Overcome the 571-ft ( 174-m ) difference between the Great Lakes with the Atlantic Coast through Canal... The fascinating history of the basin is Lock 1 south build but reduced shipping costs significantly, the!